• <ul id="cusma"></ul>
    <ul id="cusma"><sup id="cusma"></sup></ul>
    <ul id="cusma"></ul>
    <strike id="cusma"></strike>
    <ul id="cusma"></ul>
  • <del id="cusma"><dfn id="cusma"></dfn></del>
  • <ul id="cusma"></ul><ul id="cusma"></ul><tfoot id="cusma"></tfoot>

    News INFORMATION


    The construction method of marking can be divided into several categories


    Release time:2019/6/26 11:48:20 Source:www.www.27723bb.com/

    Abstract:Hand push the line width of ruling machine has the width of the hopper, commonly used 100 mm, 150 mm, 200 mm. Hot melt coating to be heated to 180-230 degrees Celsius to construction

    The construction method of lines from the result of wire drawing machine can be roughly divided into artificial marking method and mechanical construction method. Type artificial line is one of the hot melt marking the construction of the main and the most commonly used one kind of construction method. Hand push the line width of ruling machine has the width of the hopper, commonly used 100 mm, 150 mm, 200 mm. Hot melt coating to be heated to 180-230 degrees Celsius to construction, the working principle of hand push type line is the use of coating type construction, the construction, the solid cover coating into the hot kettle, melt after the flow state, put this push marker of insulation materials in the barrel. Line, introducing the molten coating line in the bucket, crossed the bucket directly on the road, because there is a certain gap between lines are linked to the ground, when push the marking machine, scrape on automatic flow and a straight line. In blow out of the line at the same time, the function of line synchronization in line evenly on the surface and a layer of reflective glass beads.

     
    1. The hand push type hot melt marking machine advantage construction with less equipment, long life, can be used for 3 to 5 years. Do marking reflective effect is better, the anti-pollution ability is strong, can keep for a long time and bright, has the good adhesion, excellent wear resistance and durability. Hot melt coating construction to prepare ahead of time, such as warning signs warning column, auxiliary tools, construction, as well as the necessary drawing board, fonts, etc. Clean the road: first of all on the road foundation treatment, was carried out on the road debris removal. If the road is difficult to use conventional methods to remove debris, steel brush is used road cleaner to be hard to remove, net road with wind blowing off the road debris, eventually reach the standard to meet the requirements of marking surface cleaning.
     
    2. Construction lofting: within the scope of the construction period, according to the construction drawings and technical requirements, measuring unreeling, so that the working standard control. After finishing the lofting, carries on the test. Early detection qualified, then please confirm to the supervision engineer. Qualified rear can be carried out under the procedure. Road marking construction precautions: construction, use high-pressure wind road net machine first road TuSha sundry blowing off, make sure the road without loose particles, dust, asphalt, oil and other impurities affecting the quality of marking and dry.
     
    3. Then according to the requirements of engineering design in the proposed construction sections using the artificial operation of the automatic feeding machine and auxiliary to pay-off, after required by coated under high-pressure airless spraying machine spraying and the type and dosage of supervision engineer for approval under the same paint (primer), besmear next machine after fully dry box self-propelled hot melt marking machine or walking type hot melt marking machine marking.
     

    Please indicate the source of the reprint:http://www.www.27723bb.com//en/news/3647.html。

    Contact us

    Get in touch with us. Please use the following contact at will.

    Enter Your name
    Please enter your mailbox account
    Fill out your message here
    Send success
    I'm sorry, your sending is wrong.

    Address:Shangdang town of Dantu District,Zhenjiang City,Jiangsu Province,China Telephone:+86 13852907688  fuhao@www.27723bb.com www.www.27723bb.com/
    主站蜘蛛池模板: 亚洲精品二区国产综合野狼| 久久久久久久久无码精品亚洲日韩 | 久久久久亚洲精品中文字幕| 欧美性videos高清精品| 国产精品原创巨作?v网站| 国产精品成人va在线观看| 免费精品无码AV片在线观看| 国产在线精品国自产拍影院| 欧美成人精品一区二区三区| 国产精品成熟老女人视频| 色一乱一伦一图一区二区精品| 日本熟妇亚洲欧美精品区| 国产精品毛片一区二区| 久久青青草原国产精品免费| WWW国产精品内射老师| 久久久无码精品亚洲日韩蜜臀浪潮 | 亚洲欧美日韩久久精品第一区| 精品国产欧美一区二区三区成人 | 亚洲国产精品一区第二页 | 久久国产精品国语对白| 国产精品第一区第27页| 国产精品成人国产乱一区| 亚洲AV永久青草无码精品| 欧美精品国产精品| 亚洲精品国产美女久久久| 精品国产AⅤ一区二区三区4区 | 精品一区二区久久久久久久网站| 亚洲中文久久精品无码ww16| 国产在线观看高清精品| 国产成人综合久久精品尤物| 日韩麻豆国产精品欧美| 欧美精品亚洲精品日韩1818| 99久久国产综合精品麻豆| 国产成人精品一区二区秒拍| 人妻精品久久无码区| 亚洲精品国产成人片| 亚洲国产精品久久久天堂| 亚洲日韩精品A∨片无码| 亚洲精品自在在线观看| 亚洲精品国产精品乱码在线观看| 少妇人妻偷人精品无码视频|