• <ul id="cusma"></ul>
    <ul id="cusma"><sup id="cusma"></sup></ul>
    <ul id="cusma"></ul>
    <strike id="cusma"></strike>
    <ul id="cusma"></ul>
  • <del id="cusma"><dfn id="cusma"></dfn></del>
  • <ul id="cusma"></ul><ul id="cusma"></ul><tfoot id="cusma"></tfoot>

    News INFORMATION


    Ruling machine work error cleaning of several skills


    Release time:2019/3/6 15:27:29 Source:www.www.27723bb.com/

    Abstract:Ruling machine work, a lot of have no contact with hot melt marking machine marking construction cli

    Ruling machine work, a lot of have no contact with hot melt marking machine marking construction clients often have such misunderstanding, think hot melt marking and room temperature cold spray, as long as there is a hot melt marking machine can the construction. However, the reality is hot melt marking construction is much more complicated than the normal temperature line construction.

    Surface cleaning: specialized personnel arrangements for road surface cleaning, guarantee the road dry clean, no dust. Measuring lofting: under the condition of the road clean, dot carried out in accordance with the design drawing, and then choose white latex material road edge line line, check and correct lines of the reentry after delimit work. Lines delimit:

    a: Add the hot melt coating into the hot melt kettle and heat it evenly to the appropriate temperature
     
    b: On one side of the laid waterline, the special primer for road shall be uniformly applied to make the road surface and the marking better stick together, and the evaporation of underground water shall be isolated to prevent the marking from falling off after construction.
     
    c: The hot melt coating melted to the construction state shall be loaded into the push type construction vehicle, and an appropriate amount of glass beads shall be put into the vehicle body.
     
    d: Regulate the flow, and conduct formal construction when the bottom oil is dried to a proper degree. The construction shall be based on the waterline to ensure the construction quality.
     
    e: The coating thickness of lane edge line, lane boundary line, guide arrow, road centerline, warning markings, etc. is 1.5-2.0mm, and the thickness of deceleration markings is 5mm. The glass beads on the surface shall be evenly distributed, and the marked lines shall have good visibility, consistent width, equal spacing, even edges, good reflective effect, and firm connection with the road surface.
     
    Construction skills of hot melt marking with marking machine
     
    As the hot melt marking construction of the marking machine, the powder hot melt marking coating needs to be heated to a high temperature of 180-200 degrees Celsius and melted into liquid before use. For the sake of construction safety, small hot melt marking machines will separate the marking device and the heating equipment for heating and melting paint, which can avoid unnecessary burns and greatly improve the efficiency of melting materials. Generally, the hot melt marking equipment required by the preliminary marking construction team includes: hydraulic double cylinder hot melt kettle, hand push hot melt marking machine, hand push hot melt zebra crossing machine, hand push pre marking machine, etc.
     
    Cleaning: During the construction, the construction line shall be marked while cleaning to ensure that there is no throwing, sprinkling, dripping, leakage and pollution, and the equipment is free of oil and water leakage. The construction team shall clean the road surface in the area at a certain distance from the marking line in time to keep the road surface clean and tidy without pollution and damage. Among them, the LXD1200 oil and gas dual cylinder hot melt kettle is recommended to use a hydraulic dual cylinder hot melt kettle. This type of hot melt kettle adopts vehicle design, which is greatly convenient for transportation. At the same time, it has the characteristics of high melting material efficiency, good melting material quality, less fuel use, energy conservation and environmental protection, simple operation, high safety, etc. It is very efficient to cooperate with the manual marking machine for the construction of yellow and white hot melt flat long solid marking lines and short virtual marking lines.
     
    The marking materials of Guruike series marking machine shall comply with the provisions of Pavement Marking Paint (JT/T280-2004).
     
    (2) The pavement shall be carefully cleaned before the construction of pavement markings. The pavement surface shall be dry and free of dust.
     
    (3) The pavement polluted by marking construction shall be cleaned in time to ensure that the pavement is clean.
     
    (4) The alignment of the marking line shall be smooth, consistent with the road shape, and the curve shall be smooth. No broken line is allowed.
     
    (5) The reflective marking glass beads shall be evenly distributed, firmly attached and evenly reflected.
     
    (6) The thickness of the marking line shall be constructed in full accordance with the requirements, and the service time limit shall be ensured.
     
    (1) To ensure the quality of the project construction process, carefully review the construction drawings before commencement, prepare the construction organization design according to the actual situation, and after approval, strictly follow the construction organization design.
     
    (2) The quality of engineering materials shall be guaranteed. Establish strict material receiving and releasing system. No unqualified materials shall be allowed to enter the site for construction.
     
    (3) , control quality from the management system
     
    a: All construction personnel shall conduct self inspection.
     
    b: The quality inspection shall be conducted once every certain distance of the construction, and the construction supervisor shall personally supervise
     
    c: The technical disclosure system shall be implemented, and the technical disclosure must be carried out before the commencement of construction

    Please indicate the source of the reprint:http://www.www.27723bb.com//en/news/3639.html。

    Contact us

    Get in touch with us. Please use the following contact at will.

    Enter Your name
    Please enter your mailbox account
    Fill out your message here
    Send success
    I'm sorry, your sending is wrong.

    Address:Shangdang town of Dantu District,Zhenjiang City,Jiangsu Province,China Telephone:+86 13852907688  fuhao@www.27723bb.com www.www.27723bb.com/
    主站蜘蛛池模板: 久久99精品久久久久久 | 国产精品18久久久久久vr| 亚洲国产精品自在线一区二区| CAOPORM国产精品视频免费| 国产AV无码专区亚洲精品| 久久久久一级精品亚洲国产成人综合AV区 | 亚洲国产精品狼友中文久久久| 日韩精品一区二区三区视频| 区亚洲欧美一级久久精品亚洲精品成人网久久久久 | 日本精品少妇一区二区三区| 亚洲精品国精品久久99热| 亚洲精品你懂的| 午夜精品久久久久久毛片| 久久国产免费观看精品3| 凹凸国产熟女精品视频app| 无码AV动漫精品一区二区免费| 成人精品一区二区三区在线观看 | 亚洲A∨精品一区二区三区| 98香蕉草草视频在线精品看| 久久国产精品一区| 亚洲无码日韩精品第一页| 国产99视频精品专区| 99久久精品午夜一区二区| 日韩精品久久久久久免费| 精品久久一区二区三区| 欧美精品中文字幕亚洲专区| 最新欧美性爱精品一区二区三区 | 少妇伦子伦精品无码STYLES | 国产精品 日韩欧美| 中文字幕精品无码一区二区| 精品人妻少妇嫩草AV无码专区| 91精品国产91久久久久久蜜臀| 国产香蕉精品视频在| 99在线精品视频观看免费| 国产美女精品一区二区三区| 国产精品自在线拍国产手机版| 亚洲精品狼友在线播放| 四虎国产精品永久地址49| 国产高清在线精品一区| 国产AV午夜精品一区二区三区| 精品国产VA久久久久久久冰|